Skip to content
Listing in the next three weeks? Text the address and the list date.
Monday – Friday: 7 a.m. – 5 p.m. · Saturday: 8 a.m. – 12 p.m. · Sunday: ClosedMonday – Friday: 7 a.m. – 5 p.m.Texts answered the same business dayHome Improvement Contractor · TN Lic. # 000000VerifyLead-Safe Certified Firm (RRP)Insured · General liability and workers' compensation
2 more licenses
  • Home Improvement Contractor · TN Lic. # 000000Verify
  • Lead-Safe Certified Firm (RRP)
  • Insured · General liability and workers' compensation
(615) 555-0107

Services

Curb appeal that holds up in the photos

Listing photos start at the curb. We clean and repair what shows from the street.

That is the front of the house: siding and walks washed, the door, trim and rails repainted, porch boards and steps repaired, beds edged and mulched, and gutters cleared.

What is included

  • Siding, walks and porch washed

  • Front door, trim and railings repainted

  • Porch boards, steps and rails repaired

  • Beds edged and mulched, shrubs trimmed back from the house

  • Gutters cleared and downspouts re-attached

Two-story brick house with a two-car garage and lawn

What moves the days and the cost

What changes this job from house to house

  • Height

    A two-story front needs ladders and a second person, which the scope writes as its own line.

  • Weather

    Exterior paint needs dry days. Spring storms in Middle Tennessee can move a line, and we text the new day.

  • Yard work

    Edging, trimming and mulch for the photos, not a landscape plan.

  • Condition of the siding

    Soft or split boards are replaced first, then washed and painted.

How it goes

Where this work sits in the 14 days

  • Day 1

    We walk the front

    Rails, steps, door and trim are photographed from the street.

  • Days 5–8

    Repairs and washing

    Boards, rails and gutters first, then the wash.

  • Days 12–13

    Edges and mulch

    Last, so the front is fresh for the day 14 walk-through.

Permits and rules

Permits and exterior limits

Washing, painting and small repairs do not need a permit. A full exterior repaint, new siding or roof work is outside the 14 days. Where the house is in a neighborhood with design rules, the agent knows them and we follow them.

Questions about this work

Do you do lawn care or landscaping?

Edging, trimming and mulch for the photos. A lawn program or a landscape plan is a different firm.

What if it rains?

Exterior lines move to the next dry day. We text the agent the same day and adjust the walk-through only if we have to.

Can you paint the whole outside?

Not inside 14 days. We paint the door, trim and rails, and say so in the scope.

Send the address and the list date

We will set a walk-through and write the scope for this work and the rest of the house.