The schedule

The 14-day plan, step by step

One board per house. These are the steps, in order. Your scope sheet puts a date on each one.

  1. Day 1

    Step 1: Walk-through

    • Agent, seller if they can come, and our estimator

    • Every room photographed and every defect circled

    • Build year asked, for the EPA lead rule

    • List date and showing dates fixed on the board

  2. Day 2

    Step 2: Written scope

    • A line per repair, with its price and its days

    • Sent by text and email, to forward as it is

    • The seller approves lines one at a time

    • Skipped lines go on the disclose-or-credit list

  3. Days 3–4

    Step 3: Orders and access

    • Materials ordered, trade visits booked to dates

    • Lockbox or key plan agreed with the agent

    • Power and water confirmed on at the house

    • Paint color and hardware finish signed off

  4. Days 5–8

    Step 4: Repairs

    • Safety items first, cosmetic repairs after

    • Licensed trades on their booked days

    • One text a day with photos of finished lines

    • Anything new we find gets a change order before work

  5. Days 9–11

    Step 5: Paint and floors

    • Patches primed, then two coats, one room at a time

    • Floors coated early in the window to cure

    • Caulk and touch-up after the paint

    • Finished rooms closed off

  6. Days 12–13

    Step 6: Punch list and clean

    • Walk the house against the day 1 list

    • Fix what is left

    • Debris hauled off, house cleaned to photo-ready

    • Exterior edges and mulch last

  7. Day 14

    Step 7: Listing-ready walk-through

    • The agent walks it with us

    • A photo report of every repaired line

    • Receipts and the line-by-line invoice

    • The report is yours to share with a buyer's agent

What we need

Three things we need from you

  • Access

    A lockbox code, a key hand-off or the seller at the door. We agree which on day 3.

  • Decisions by day 3

    Which lines to do, the paint color, and the hardware finish. We send photos to choose from.

  • Power and water on

    Both need to stay on at the house for all 14 days, including the vacant ones.

Be realistic

What fits in 14 days and what runs longer

The board holds when the lines are small and the trades are booked. These are the ones that bend it.

What fits in 14 days and what runs longer
The lineNeeds more daysFits in 14 days
Patching and painting a whole houseNeeds more daysNot if every ceiling is stainedFits in 14 daysBetter: Yes, with enough people on site
Refinishing hardwoodNeeds more daysFull sanding and stain, because of cure timeFits in 14 daysScreen and recoat, done by day 11
CabinetsNeeds more daysNew cabinets, because of lead timeFits in 14 daysBetter: New pulls and painted doors
Exterior paintNeeds more daysWhole house, because of weatherFits in 14 daysDoor, trim and rails in dry weather
A licensed trade's repairNeeds more daysWhen they cannot, and the line leaves the boardFits in 14 daysWhen they book a day inside the plan

A shorter window

If your list date is sooner than the plan

Tell us the date on day 1. The scope on day 2 says which lines fit before it and which would run past it. The seller picks, and the rest go on the disclose-or-credit list.

A compressed schedule usually means more people on site, and that shows in the lines that move. It never means skipping the day 14 walk-through.

Send the address and the list date

Walk-through slots book about a week out. The earlier you text, the more days the plan has.